Hydraulic home lift installation guide
The hydraulic home lift is a home lift platform specially designed for home users. The product comes from the optimization design of hydraulic lift platform technology and elevator technology. This type of hydraulic home lift adopts a vertical guidance system, hydraulic drive, stable and safe lifting, and the external use of stainless steel panel, which is beautiful and high-grade. The hydraulic home lift can be directly installed on the ground, without the need to build a machine room, without a supporting civil pit, and does not occupy the room area. It is suitable for two or three-story buildings and can install buttons in different layers to realize multi-point control. The utility model has the advantages of good stability, high safety factor, low noise, small occupation space, etc. It is easy to install and maintain.
Before installation, the home elevator installation personnel should read this installation manual carefully, and all elevator parts installation personnel must strictly abide by the relevant safety regulations; The installation personnel shall be familiar with the elevator installation, enterprise product standards, civil engineering data of the installed elevator, installation drawings of home lift components and the whole machine, elevator operation and maintenance instructions, electrical control schematic diagram, electrical wiring diagram, structure, control mode, etc., and make specific progress plan and installation process. The installation personnel strictly abide by this installation manual and will provide the maximum guarantee for the hydraulic home elevator performance and user’s safety. To provide customers with stable quality and superior performance of the hydraulic home lift.
The installation of the hydraulic elevator involves several aspects. According to the structure of the hydraulic elevator, we divide the hydraulic elevator into several parts, such as the guide rail frame of the hydraulic elevator, the lift car of the hydraulic elevator, the shaft design of the hydraulic elevator, and the circuit connection the hydraulic elevator. As a professional manufacturer of the hydraulic elevator, we will provide our customers with a complete installation manual and guidance video. According to our many years of experience in exporting hydraulic elevators, The installation of hydraulic elevators requires the cooperation of 2-3 personnel, which usually requires ordinary mechanics or electricians, and takes about 1-2 days.
In installing the hydraulic elevator, the most important thing is to maintain the verticality of the hydraulic elevator and ensure that the elevator has no deviation in the horizontal and vertical directions so that the hydraulic elevator can be used for a longer time.
If you want the complete please contact LIFCORE staff at any time!

Hydraulic home lift installation steps (pictures are for reference only)
Step 1:
An Installing guide rail frame section 1, put oil cylinder base

B Installing sections 2 and 3, connected by screw.

C Fix to the wall by expansion bolts

Step 2:
Guide rail wheels are installed on the cabin plate.

Note: The guide rail wheels have front and back)see below

B Put cabin into the guide rail frame
C Install T -type guide rail

Don’t leave a gap for all-around of guide rail wheels and T-type guide rails

Step 3 Fix frame and keep up and down vertical
Install oil cylinder Install lifting frame Install chain or Rope
Step 4
Installing the distribution box, connect the power supply
A Connect temporary button, use internal call button connect 4 lines (emergency stop, public, 1, 2)

Connect pump station

Step 5
A Reinforce all guide rail frames
B Install limit switch. 1 leveling 2 deceleration
2 limit switches were installed on the first floor
The distance from (1-1 limit switch) to (1-2 deceleration) is 250mm, as shown in the picture below.

C 3 limit switches on the second floor
2-1 deceleration 2-2 leveling 2-3 maximum limit
Distance between (2-1 deceleration) and (2-2 leveling) is 250mm
Distance between (2-2 leveling) and (2-3 maximum limit) is 30mm
Connect all switch wires to the corresponding socket of the distribution box and adjust the height of each floor by limit switch.
Step 6
Install the stainless steel frame in front of the guide rail (do not install stainless steel plate for now)
Step 7
- Install the cabin, and the glass on both sides of the cabin corresponds to the bolt hole

B Install cabin ceiling light

Install the cabin door
D Remove the temporary buttons and installs them in the cabin
The light wire needs to be connected to the internal call box of the cabin, and the accompanying wire corresponds to the distribution box
Step 8
Install two layers of stainless steel on the guide rail, and install all stainless steel on the guide rail
Step 9
Install external call box (buttons on each floor). The wire of the external call box on the 2nd floor is corresponding to the external call box on the 1st floor
The wire of the external call box on the 1st floor is corresponding to the distribution box
HYDRAULIC HOME LIFT SHAFT
Hydraulic Home Lift Shaft Requirements – Technical Guidelines
a) Shaft dimensions must be accurate. A tolerance of +10mm is acceptable across all installation configurations.
b) The total lift travel, measured from the finished floor level (FFL) of the lowest stop to the FFL of the highest stop (including flooring materials), is critical. It must match the dimensions specified on the final approved drawings.
c) The shaft ceiling height may exceed the required headroom stated in the final plans, but must not be lower when measured from the top landing’s FFL.
d) The shaft structure must be capable of handling the loads imposed by the lift system. Refer to page 2 (top-right corner) of the lift drawing for exact loading data. In general, the lift applies approximately 3000N of horizontal dynamic force and 10,000N of vertical static force (downward on the running gear side). A qualified structural engineer must verify that the shaft and building can bear these loads safely.
e) The load-bearing wall must be constructed of solid materials such as in-situ or precast concrete, core-filled concrete blockwork, solid masonry, or engineered steel. Steel framing must be designed by a structural engineer. Where steel is used, additional installation time and charges may apply for welding mounting brackets. Structural welding must be arranged by others. Wall deflection should not exceed 1–2mm for columns of 150mm width. No wall sheeting should conceal structural steel—finishes must be flush with the front face. All four shaft walls must be fully enclosed and non-perforated.
f) For shafts incorporating glass elements, only laminated safety glass (minimum 10.76mm thick) is acceptable. Ensure there are no internal ledges over 50mm in depth within the shaft.
g) The wall accommodating the landing doors must be sufficiently solid to support the door frame and jamb, which exert a load similar to a conventional heavy door. Double stud timber or steel at least 5mm thick is required for secure tapping and threading.
h) All shaft walls must comply with AS1735 standards and be clad using a minimum of 1.2mm steel sheeting or a material of equal structural integrity and smooth finish.
i) Shaft dimensions shown on lift plans reflect internal finished sizes. If render or cladding is to be applied, this must be taken into account so the final interior shaft dimensions conform to the specified requirements.
j) The wall areas above and below the door openings will remain visible from inside the lift car during travel. Final finishing should ideally occur after door installation to ensure proper alignment—unless the shaft has been professionally surveyed and verified for accuracy.
k) The shaft must be built to be plumb, square, clean, and level. There should be no protrusions, ledges, or debris.
l) Both the load-bearing wall and door-opening surfaces must be vertically aligned within a tolerance of ±5mm.
m) No unrelated services (e.g., plumbing, electrical conduits, etc.) are permitted within the shaft. Only systems directly related to the elevator may occupy the shaft space. Penetrations through the shaft walls are strictly prohibited as all lift components require secure anchoring, and any foreign services may be damaged during installation.
Inspection and testing
Commissioning Instructions for Hydraulic Home Elevator
The commissioning process must take place after the complete installation of the elevator. Prior to testing, ensure the guide rails inside the shaft are thoroughly cleaned, and that the shaft is free from any obstructions to prevent accidents during test runs.
Pre-Commissioning Checklist:
Verify that all electrical wiring in the control/distribution box is correctly installed.
Ensure that the call buttons, limit switches, and lighting circuits are securely connected, with no exposed wire ends or signs of current leakage.
Confirm that all threaded and hydraulic connections are properly tightened. Inspect for any signs of hydraulic fluid leaks, unusual noises, or abnormal behavior in the hydraulic, electrical, or structural systems.
Once power is supplied and the indicator light is on, start the motor and operate the oil pump. Perform 2–3 no-load test runs to confirm basic functionality.
Conduct a load test to verify the elevator’s performance under working conditions.
Check whether the buttons on the lift car control panel and floor call boxes are responding correctly and consistently.
Ensure that all six nylon guide shoes slide smoothly within the RA guide rails, allowing for a quiet and stable ride without abnormal noise or vibration.
Safe Operation Guidelines
To ensure the safety of all users, please observe the following safety instructions when using the hydraulic home lift:
Use the lift responsibly. Avoid pressing buttons with sharp objects such as keys, pens, or tools.
Do not overload the lift. Always stay within the rated capacity shown inside the cabin.
Board or exit only when the lift is completely stationary. Do not rush or push during entry or exit.
Avoid disruptive behavior. No jumping, playing, or shaking inside the lift car.
Do not forcefully stop the lift. Let the system complete its operation cycle naturally.
In the event of a malfunction or power failure, remain calm and request assistance immediately using the communication system or emergency contact method.
If the lift will be unused for an extended period, please disconnect the main power switch located in the control cabinet to ensure safety and protect the equipment.